Płock 04

Construction

  • post: Ø60.3 mm tube
  • crossbar: Ø30 mm tube
  • upon request, the crossbar can be profiled into arcs that match the natural curves of the installation site
  • as standard, the upper part of the post is secured with a plastic cap; four shapes of aluminum decorations are also available as an option (11.11, 12.12, 13.13, 14.14)

Finishing options

  • galvanized + powder coating in a selected color from the RAL palette

Installation

  • by concreting the legs into a concrete foundation
  • using double-strut steel anchors (for use only in hard and solid ground) – this form of installation is not permitted
Category:

Download the product data sheet Płock 04

Check here

Polished stainless steel stands - up to 4 weeks from production acceptance/payment of the proforma.

Galvanized stands - up to 5 weeks from production acceptance/payment of the proforma.

Galvanized and painted stands - up to 6 weeks from production acceptance/payment of the proforma.

Check here